Sea viewUAE-00014Sheikh Zayed Road, Dubai: Apartments with Offices in the Building
Jebel Ali, Dubai
- 1–2beds
- 1–2baths
- 48–89 m²
Off-plan · 2029
Jebel Ali, Dubai
The tower stands directly on Sheikh Zayed Road in Jebel Ali, the corridor that carries most of Dubai's traffic between the old city and the new one. A dedicated bridge runs from the second floor of the podium straight onto the highway intersection, which in this city is worth more than it sounds: it takes the daily exit out of the surface traffic entirely. The metro is minutes away, Dubai Marina and Jumeirah Lake Towers are next door, and the upper floors look out over the Jumeirah Islands, Bluewaters and the Palm. The bridge is the detail worth understanding. From the second floor of the podium a private fly-out ramp joins the Sheikh Zayed Road intersection directly, so a car leaves the building and is on the highway without touching a surface road. That kind of access is normally built for offices and malls, not for homes. Inside, the apartments run from the thirteenth floor to the seventieth in one and two bedroom layouts, and the one bedroom range here is unusually wide, from compact plans up to homes approaching ninety square metres. Every apartment has a balcony and floor to ceiling glass. This is one of six interconnected towers set around a shared podium, and the everyday infrastructure sits inside the development rather than a drive away. A full shopping mall runs along the lower levels together with healthcare and retail, and 175,000 square feet of office space with a business centre and co-working areas is an elevator ride from the apartments. Above them the podium carries a children's pool, a lap pool, a leisure pool and a jacuzzi, a jogging track, an outdoor exercise space, a football ground, a cricket batting enclosure and a putting course. Indoors there is a gym, a library, a clubhouse and a theatre, and outside an open air cinema lawn, an amphitheatre, a dog park and a family barbecue area. Ownership is freehold and open to foreign buyers. Handover is scheduled for December 2029, and the purchase is staged across the build with a large final portion falling due on completion. Two things to check before committing. That completion payment needs planning from the start, not from the last year. And availability on this masterplan moves quickly and resale listings are already circulating, so confirm directly what is open in this tower rather than relying on published lists.
Reference: UAE-00013
Sea viewUAE-00014Jebel Ali, Dubai
Off-plan · 2029
Sea viewUAE-00010Jebel Ali, Dubai
Off-plan · 2029
Sea viewUAE-00012Jebel Ali, Dubai
Off-plan · 2030
Sea viewUAE-00011Jebel Ali, Dubai
Off-plan · 2029